|
products
|
|
|
New Lay Procedure
The main features of the lay down procedure are:
- Realistic 3D laying procedure based on user-defined target pipeline plan route
- Specification of the tension and angle of the steering/feeding point
- Logging of steering point
- Re-meshing capability after completion of the lay process
- Graphical representation of the lay process during computation
Seabed-Soil Contact
- Pipe-soil interaction: contact detection, pipe penetration/lift-off and soil response
- Non-linear soil behaviour law (axial, lateral and vertical) with non-linear soil deformation
- Anisotropic friction (incl. adhesion)
- 3D seabed using regular grid Digital Terrain Modelling (DTM)
- Variable soil properties
|
|
 |