New Lay Procedure

The main features of the lay down procedure are:

  • Realistic 3D laying procedure based on user-defined target pipeline plan route
  • Specification of the tension and angle of the steering/feeding point
  • Logging of steering point
  • Re-meshing capability after completion of the lay process
  • Graphical representation of the lay process during computation


Seabed-Soil Contact
  • Pipe-soil interaction: contact detection, pipe penetration/lift-off and soil response
  • Non-linear soil behaviour law (axial, lateral and vertical) with non-linear soil deformation
  • Anisotropic friction (incl. adhesion)
  • 3D seabed using regular grid Digital Terrain Modelling (DTM)
  • Variable soil properties