|
Analysis Type
Pipeline Pick-Up
The pipeline is resting on a flat seabed and is lifted up by both plough grabs/rollers.
This situation occurs at the start and the end of the ploughing operation.
Pipeline Trenching
The pipeline is partially in the trench while the remaining part is resting on the original seabed.
The pipeline is therefore spanning over the trench. This situation occurs during
normal ploughing operations.
|